Mary Ellen,

There might be a better alternative via discussion with your engineering group. You might want to include your fire protection people in the discussion as well.

thanks
Ken

Ken Kretchman, CIH, CSP Director, Environmental Health and Safety
Campus Box 8007 / 2620 Wolf Village Way / Raleigh North Carolina 27695-8007
Email: Ken_Kretchman**At_Symbol_Here**ncsu.edu / Phone: (919).515.6860 / Fax: (919).515.6307


On Mon, Apr 29, 2013 at 4:06 PM, Mary Ellen A Scott <mas35**At_Symbol_Here**case.edu> wrote:
Thank you all, especially Kay for this suggestion. I will follow up.


On Mon, Apr 29, 2013 at 12:57 PM, Monona Rossol <actsnyc**At_Symbol_Here**cs.com> wrote:
Mary Ellen, Listen to Kay. This is one way to use a makeup unit to fix the problem that we talked abut. And diffusing it through the ceiling tiles is a good method of distributing the additional make up air. This is not rocket science. If they want to fix this, they can in short order.
Monona Rossol, M.S., M.F.A., Industrial Hygienist
President: Arts, Crafts & Theater Safety, Inc.
Safety Officer: Local USA829, IATSE
181 Thompson St., #23
New York, NY 10012 212-777-0062

-----Original Message-----
From: Rita Kay Calhoun <r.calhoun**At_Symbol_Here**MOREHEADSTATE.EDU>
To: DCHAS-L <DCHAS-L**At_Symbol_Here**MED.CORNELL.EDU>
Sent: Mon, Apr 29, 2013 12:08 pm
Subject: Re: [DCHAS-L] Chemistry Fume Hood Experience

Mary Ellen,
When they built our new labs they discovered that the amount of supply air coming through the diffusers (or whatever they're called) was insufficient. The solution was to replace many of the ceiling tiles with open grate type tiles and pump supply air into the ceiling space. This has solved that problem. By the way, we didn't have alarm problems; we had "air flow from the hoods into the room" problems. It was noticed when we were doing a Cu/S experiment. You can always count on SO2 to let you know when it's not where it's supposed to be. The most interesting part was that the display still read 100lfm, even when the flow was 100lfm into the lab!
Kay
From: DCHAS-L Discussion List [mailto:dchas-l**At_Symbol_Here**MED.CORNELL.EDU] On Behalf Of Mary Ellen A Scott
Sent: Monday, April 29, 2013 10:47 AM
To: DCHAS-L**At_Symbol_Here**MED.CORNELL.EDU
Subject: Re: [DCHAS-L] Chemistry Fume Hood Experience
The biggest issue we have is supply air or lack there of. At least all are VAV hoods go into alarm so much that the students just put paper in the MUTE button. We seem to have created a cry wolf situation.



--
Mary Ellen Scott, PhD.
Safety Specialist II
Case Western Reserve University
EHS - Environmental Health and Safety
Service Building 1st Floor Rm 113
2220 Circle Dr.
Cleveland, OH 44106-7227
216-368-6077
216-368-2236 (Fax)
maryellen.scott**At_Symbol_Here**case.edu
"There is no science without fancy and no art without fact" =96 Vladimir Nabokov (1899-1977)


Previous post   |  Top of Page   |   Next post



The content of this page reflects the personal opinion(s) of the author(s) only, not the American Chemical Society, ILPI, Safety Emporium, or any other party. Use of any information on this page is at the reader's own risk. Unauthorized reproduction of these materials is prohibited. Send questions/comments about the archive to secretary@dchas.org.
The maintenance and hosting of the DCHAS-L archive is provided through the generous support of Safety Emporium.